Hi,
Trying to get my mind around whether I can do the following.
I have to install and update a system that has a program component (~6MB) and a data component (currently 92MB).
At the moment I have been updating both at the same time using a single version control - ie if I get data updates then install program (even though no change) - or if update / patch program then also install all the data.
Is there any way to have a two version process - one for program and an other for data - or do I need to have two separate installations (not something I believe users would be able to handle)?
Or might I have to manage version control such that the second series of number points to program version and third series of number points to data version - for example.
1.1.100.0 = program version of 1 - data version of 100
1.1.101.0 = program version of 1 - data version of 101
1.2.1.0 = new program and new data
in this case program and data also get updated.
Is there a way I can:
1) Install both (program and data) for a new installation (OK with this) as well as...
2) Install only data component over an earlier version of program and data (keeping same program)....
3) Install both program and data over earlier version (as per current)..
4) Install only program (as a patch / enhancement).
I am looking at feasibility of updating off the web where client program would go looking for a file that contains updated data, download and then run a program to update data tables with new information - this would reduce 92mb to probably < 1mb for each update.
Any comments welcomed if you think there is a better way. At the moment we are creating many CD's and using snail mail to get the updates out which is costly and time consuming.
Thanks.
Brian.
FOLLOW US
Get the latest news in Application Packaging