Hi,
I recently upgraded from 10.6 to 10.7, and since then I've had issues with the VS2012 integrated projects. My VS solution has lots of projects (>100) in it, including the AI projects. The issue is I'm trying to limit what is included in the AI projects to some specific Project outputs. The process of doing this is rather complex in AI, as I need to manually determine project dependencies, and include those projects outputs into the AI project. I can live with this, although it is something I'd expect AI to work out through the project dependencies in the solution. My real issue is that after certain VS operations (like open solution, get-latest in source control, etc), the AI solutions "overwrite" what I have setup in the project outputs, and blindy add almost all outputs of all projects in my solution.
I'm at a point where I may have to downgrade back to 10.6, as I can't keep "resetting" the project outputs in the AI solutions.
Thanks
Garry