SamuelB
Posts: 4
Joined: Mon Oct 22, 2007 3:32 am

Controlling a Progress Bar on a custom UI

Hello,

I have advanced installer enterprise and am looking for a way to control a progress bar from within a vb script.

My current script takes some time to complete - (executed under a deferred custom action) and so I would like to update a progress bar while it is executed.

Thanks for any help,

Sam
Cosmin
Posts: 5797
Joined: Tue Jul 10, 2007 6:39 pm
Contact: Website

Hi,

There is an example for this type of custom action in the MSDN library, please take a look:
http://msdn2.microsoft.com/en-us/library/aa367525.aspx

You can modify this example to work for your project.

Regards,
Cosmin
Cosmin Pirvu - Advanced Installer Team
Follow us: Twitter - Facebook - YouTube
SamuelB
Posts: 4
Joined: Mon Oct 22, 2007 3:32 am

Hello again,

for anybody who is interested, here is the vbscript translation:
----------------------------------

const msiMessageTypeActionStart = &H08000000
const msiMessageTypeProgress = &H0A000000
const msiMessageTypeActionData = &H09000000

const iTickIncrement = 10000
const iNumberItems = 10

Dim iTotalTicks


dim oActionRec, oProgressRec, oActionData


Sub TestProgressBar

iTotalTicks = iTickIncrement * iNumberItems

if session.mode(16) then


set oProgressRec = session.Installer.createRecord(3)
oProgressRec.IntegerData(1) = 0
oProgressRec.IntegerData(2) = iTotalTicks
oProgressRec.IntegerData(3) = 0
session.message msiMessageTypeProgress, oProgressRec


' Installer is executing the installation script. Set up a
' record specifying appropriate templates and text for
' messages that will inform the user about what the custom
' action is doing. Tell the installer to use this template and
' text in progress messages.
set oActionRec = session.Installer.createRecord(3)
oActionRec.StringData(1) = "TestProgressBar" 'Action name
oActionRec.StringData(2) = "Incrementing the Progress Bar..." 'Description
oActionRec.StringData(3) = "Incrementing tick [1] of [2]" 'template for action data messages
session.message msiMessageTypeActionStart, oActionRec

' Tell the installer to use explicit progress messages.
oProgressRec.IntegerData(1) = 1 'reset
oProgressRec.IntegerData(2) = 1 'total ticks + 1
oProgressRec.IntegerData(3) = 0 'right to left
session.message msiMessageTypeProgress,oProgressRec

' Tell the installer to increment for each ActionData message
oProgressRec.IntegerData(1) = 2 'action info
oProgressRec.IntegerData(2) = iTickIncrement 'increment 1 tick per
oProgressRec.IntegerData(3) = 0 'increment 1 bar per tick
' session.message msiMessageTypeProgress,oProgressRec


' The following loop sets up the record needed by the action
' messages and tells the installer to send a message to update
' the progress bar.
' set oActionRec = session.Installer.createRecord(3)
oActionRec.IntegerData(2) = iTotalTicks

dim x

for x = 0 to iTotalTicks step iTickIncrement
MsgBox cstr(x)
oActionRec.IntegerData(1) = x

session.message msiMessageTypeActionData, oActionRec
session.message msiMessageTypeProgress, oProgressRec
next

MsgBox "Leaving TestProgressBar"

else

' Installer is generating the installation script of the custom action.
' Tell the installer to increase the value of the final total
' length of the progress bar by the total number of ticks in
' the custom action.

set oProgressRec = session.Installer.createRecord(2)
oProgressRec.IntegerData(1) = 3
oProgressRec.IntegerData(2) = iTotalTicks

session.message msiMessageTypeProgress, oProgressRec
end if

End Sub

-----------------------


other useful information can be found at:
http://msdn2.microsoft.com/en-us/library/aa367525.aspx
http://msdn2.microsoft.com/en-us/library/aa371614.aspx
http://msdn2.microsoft.com/en-us/library/aa370354.aspx


Note this example will reset and then increment the progress bar for the loop. I could not figure out:

A) how to extend the progress bar with additional ticks

i.e.:

set oProgressRec = session.Installer.createRecord(2)
oProgressRec.IntegerData(1) = 3
oProgressRec.IntegerData(2) = iTotalTicks
session.message msiMessageTypeProgress, oProgressRec

does not seem to make a difference

B) assign this control to a different progress bar object

Regards,
Sam
SamuelB
Posts: 4
Joined: Mon Oct 22, 2007 3:32 am

Hello,

Any ideas on how to assign this code to a different progress bar object?

Regards,
Sam.
Cosmin
Posts: 5797
Joined: Tue Jul 10, 2007 6:39 pm
Contact: Website

Hi,

I'm not sure how exactly this can be done.

Note that a progress bar subscribes to the SetProgress ControlEvent, but it can also subscribe to a ControlEvent named after the action being monitored.

You can try to edit the MSI with Orca and subscribe the second progress bar to a ControlEvent with the same name as your custom action.

Regards,
Cosmin
Cosmin Pirvu - Advanced Installer Team
Follow us: Twitter - Facebook - YouTube

Return to “Common Problems”